Lean Product Management – Minimizing Wait Times
280 Group
AUGUST 22, 2017
In the previous post on developing a Lean Mindset, we covered flow efficiency and how to apply the principle to get from idea to MVP (minimum viable product) faster. The post ended by mentioning two ways to shorten the time to MVP: Minimizing wait times (i.e., non-value added time) and Improving the productivity of our value-added steps. In this post we’ll focus on the first method, to minimize wait times.
Let's personalize your content